goraedu

AHERA reinspection and surveillance dates

Enter a school building's last reinspection and periodic surveillance dates to see the latest dates EPA's school asbestos rule allows for the next ones, with the rule's exact words.

Fact-checked against official sources (eCFR text as of Nov 4, 2026) · Last checked

One school building with a management plan in effect. Your input

Nothing you type leaves your browser.

Reinspection, 40 CFR 763.85(b) Our calculation

Enter the last reinspection date

“At least once every 3 years after a management plan is in effect, each local education agency shall conduct a reinspection of all friable and nonfriable known or assumed ACBM in each school building that they lease, own, or otherwise use as a school building.”
40 CFR 763.85(b)(1)
“Each inspection shall be made by an accredited inspector.”
40 CFR 763.85(b)(2)

Periodic surveillance, 40 CFR 763.92(b) Our calculation

Enter the last surveillance date

“At least once every 6 months after a management plan is in effect, each local education agency shall conduct periodic surveillance in each building that it leases, owns, or otherwise uses as a school building that contains ACBM or is assumed to contain ACBM.”
40 CFR 763.92(b)(1)

A study aid, not a compliance determination. It does not cover what each reinspection or surveillance must include, recordkeeping, or response actions. Your State may have its own asbestos rules, so check them too.

A study aid, not legal or compliance advice. goraedu is not an accredited asbestos training provider and does not train, accredit or certify anyone; our questions are not a course or accreditation exam. Not affiliated with or endorsed by OSHA, the U.S. Department of Labor, the U.S. EPA or any State. Spot an error? Tell us.