OSHA's construction standard 29 CFR 1926.703(e) says forms and shores (except those for slabs on grade and slip forms) may not be removed until the employer determines the concrete has gained sufficient strength to support its weight and superimposed loads, based either on removal conditions stipulated in the plans and specifications having been followed, or on an appropriate ASTM compressive strength test whose results show the concrete has gained sufficient strength. The section also requires shoring to be inspected before erection and immediately before, during and immediately after concrete placement.

OSHA construction safetyExplainerPublished

Fact-checked against official sources · Last checked

Card reading OSHA construction safety, Explainer: When can concrete forms and shores come off? 29 CFR 1926.703. eCFR, checked Nov 18, 2026
Image: goraedu · Own work

For OSHA construction safety on concrete work, a common question is when the forms and shores may come off. The federal answer is in 29 CFR 1926.703, "Requirements for cast-in-place concrete," in Subpart Q of the construction standards, which covers concrete and masonry construction operations (1926.700(a)). This explainer reads the section as it stands in the eCFR (text current to November 16, 2026). Nothing here describes a rule change, and it does not cover general industry workplaces under Part 1910.

What counts as formwork and shoring?

1926.700(b) defines the terms. "Formwork means the total system of support for freshly placed or partially cured concrete, including the mold or sheeting (form) that is in contact with the concrete as well as all supporting members including shores, reshores, hardware, braces, and related hardware." A shore is "a supporting member that resists a compressive force imposed by a load." Reshoring is "the construction operation in which shoring equipment (also called reshores or reshoring equipment) is placed, as the original forms and shores are removed, in order to support partially cured concrete and construction loads."

When may forms and shores be removed?

1926.703(e)(1) states: "Forms and shores (except those used for slabs on grade and slip forms) shall not be removed until the employer determines that the concrete has gained sufficient strength to support its weight and superimposed loads."

The determination has to rest on one of two grounds:

  • "(i) The plans and specifications stipulate conditions for removal of forms and shores, and such conditions have been followed, or"
  • "(ii) The concrete has been properly tested with an appropriate ASTM standard test method designed to indicate the concrete compressive strength, and the test results indicate that the concrete has gained sufficient strength to support its weight and superimposed loads."

The rule itself sets no fixed number of days. It ties removal to the plans and specifications or to a strength test. Note the exception in the text: forms and shores used for slabs on grade and slip forms are excepted from 1926.703(e)(1).

What about reshores?

Reshoring has its own two rules. It "shall be erected, as the original forms and shores are removed, whenever the concrete is required to support loads in excess of its capacity" (1926.703(b)(10)). And under 1926.703(e)(2), "Reshoring shall not be removed until the concrete being supported has attained adequate strength to support its weight and all loads in place upon it."

When must shoring be inspected?

1926.703(b) sets inspections at several points:

  • Before erection: "All shoring equipment (including equipment used in reshoring operations) shall be inspected prior to erection to determine that the equipment meets the requirements specified in the formwork drawings." (1926.703(b)(1))
  • Around the pour: "Erected shoring equipment shall be inspected immediately prior to, during, and immediately after concrete placement." (1926.703(b)(3))

Damaged equipment is handled two ways. Shoring equipment damaged so that its strength is below what 1926.703(a)(1) requires "shall not be used for shoring" (1926.703(b)(2)). If the damage or weakening is found after erection, the equipment "shall be immediately reinforced" (1926.703(b)(4)).

Two more shoring rules: "Adjustment of single post shores to raise formwork shall not be made after the placement of concrete" (1926.703(b)(9)), and whenever single post shores are used one on top of another (tiered), "The design of the shoring shall be prepared by a qualified designer and the erected shoring shall be inspected by an engineer qualified in structural design" (1926.703(b)(8)(i)).

What must be at the jobsite?

1926.703(a)(2) states: "Drawings or plans, including all revisions, for the jack layout, formwork (including shoring equipment), working decks, and scaffolds, shall be available at the jobsite."

The general formwork standard is in 1926.703(a)(1): formwork must be designed, fabricated, erected, supported, braced and maintained so that it will be "capable of supporting without failure all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork." A non-mandatory appendix to the section says formwork designed, fabricated, erected, braced, supported and maintained in accordance with Sections 6 and 7 of ANSI A10.9-1983 "shall be deemed to be in compliance" with 1926.703(a)(1). This post does not summarize that ANSI standard.

Other rules in Subpart Q

1926.700(a) adds that "In addition to the requirements in subpart Q, other relevant provisions in parts 1910 and 1926 apply to concrete and masonry construction operations." This post covers only the formwork, shoring and removal rules of 1926.703; it does not cover vertical slip forms, precast concrete, lift-slab operations or masonry.

Study links

None of our OSHA construction study guides covers Subpart Q. For the general construction rules that apply alongside it, see the OSHA general safety study guide and the OSHA construction safety hub.

goraedu is independent and is not affiliated with or endorsed by OSHA or the U.S. Department of Labor.

Sources

Found an error? Email [email protected]. We review reports within 7 days and log fixes on the corrections page.