OSHA general industry electric power generation, transmission and distribution practice questions
20 free practice questions from 29 CFR 1910.269. Each answer is explained and linked to the rule it comes from.
OSHA Electric power generation, transmission and distribution
20 questions across 8 topics. After each answer you see why it is right, with a link to the official source.
Tip: press A, B, C or D to answer and Enter for the next question. Nothing you answer leaves your browser.
Review all 20 questions
Prefer to read? Here is every question in the OSHA Electric power generation, transmission and distribution set, grouped by topic. Open a question to see the answer, why it is right and the official source.
Scope and application
1. Under 1910.269(a)(1)(ii)(A), section 1910.269 does not apply to construction work as defined in 1910.12, with which exception?
- A. Any work done by an electric utility's own employees
- B. Any work done on lines energized at more than 600 volts
- C. Line-clearance tree trimming and work involving electric power generation installations as specified in 1926.950(a)(3)
- D. Any work that lasts longer than 30 days
Show answer
Answer: C. Line-clearance tree trimming and work involving electric power generation installations as specified in 1926.950(a)(3)
Section 1910.269 does not apply "To construction work, as defined in § 1910.12 of this part, except for line-clearance tree trimming and work involving electric power generation installations as specified in § 1926.950(a)(3) of this chapter."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
2. A factory has supplementary electric generating equipment used to supply the workplace for emergency or standby purposes only. Under the note to 1910.269(a)(1)(i)(A), which part of the rules covers that equipment?
- A. Subpart S of Part 1910
- B. Paragraph (v) of 1910.269, on power generation
- C. Paragraph (u) of 1910.269, on substations
- D. No OSHA rule covers it
Show answer
Answer: A. Subpart S of Part 1910
The note states: "Subpart S of this part covers supplementary electric generating equipment that is used to supply a workplace for emergency, standby, or similar purposes only."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Training and information transfer
3. Under 1910.269(a)(2)(i)(C), what determines the degree of training an employee must receive?
- A. The employee's years of service with the employer
- B. The number of employees on the crew
- C. The size of the employer's service territory
- D. The risk to the employee for the hazard involved
Show answer
Answer: D. The risk to the employee for the hazard involved
The rule states: "The degree of training shall be determined by the risk to the employee for the hazard involved."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
4. An employee will perform a task that is done less often than once per year. How does the note to 1910.269(a)(2)(v)(C) say OSHA considers such tasks?
- A. As exempt from the training requirements of the section
- B. As necessitating retraining before the performance of the work practices involved
- C. As tasks only a contract employer may perform
- D. As requiring a written test after the work is finished
Show answer
Answer: B. As necessitating retraining before the performance of the work practices involved
The note states that OSHA "considers tasks that are performed less often than once per year to necessitate retraining before the performance of the work practices involved."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
5. During its work, a contract employer finds an unanticipated hazardous condition that the host employer did not mention. What deadline does 1910.269(a)(3)(ii)(C) set for telling the host employer?
- A. Within 10 working days after discovering the condition
- B. Within 2 working days after discovering the hazardous condition
- C. By the end of the contract
- D. At the next annual inspection
Show answer
Answer: B. Within 2 working days after discovering the hazardous condition
The contract employer must advise the host employer of the condition and "shall provide this information to the host employer within 2 working days after discovering the hazardous condition."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
First aid and job briefings
6. Employees work on exposed lines energized at 50 volts or more at a remote substation, and there are too few employees for a trained person to reach each exposed employee within the time the rule sets. What does 1910.269(b)(1)(ii) require?
- A. One trained person must be on call by telephone
- B. The work must be postponed until a trained person arrives
- C. A first-aid kit must be placed at each piece of equipment instead
- D. Each employee at the work location shall be a trained employee
Show answer
Answer: D. Each employee at the work location shall be a trained employee
Where the existing number of employees is too small to meet the requirement "(at a remote substation, for example), each employee at the work location shall be a trained employee."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
7. In assigning an employee or a group of employees to perform a job, what does 1910.269(c)(1)(i) require the employer to provide to the employee in charge of the job?
- A. All available information that relates to the determination of existing characteristics and conditions required by paragraph (a)(4)
- B. A copy of each crew member's medical records
- C. A written briefing approved in advance by OSHA
- D. Only the street address of the job site
Show answer
Answer: A. All available information that relates to the determination of existing characteristics and conditions required by paragraph (a)(4)
The employer "shall provide the employee in charge of the job with all available information that relates to the determination of existing characteristics and conditions required by paragraph (a)(4) of this section."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Enclosed spaces and underground installations
8. Before any entrance cover to an enclosed space is removed, how does 1910.269(e)(4) require the employer to determine whether it is safe to do so?
- A. By asking the last crew that worked in the space
- B. By waiting 24 hours after the space was last entered
- C. By checking for the presence of any atmospheric pressure or temperature differences and evaluating whether there might be a hazardous atmosphere in the space
- D. By removing the cover quickly and testing the air afterward
Show answer
Answer: C. By checking for the presence of any atmospheric pressure or temperature differences and evaluating whether there might be a hazardous atmosphere in the space
The employer "shall determine whether it is safe to do so by checking for the presence of any atmospheric pressure or temperature differences and by evaluating whether there might be a hazardous atmosphere in the space."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
9. Continuous forced-air ventilation is used for an enclosed space. Under 1910.269(e)(12), how long must the ventilation continue?
- A. Until all employees leave the enclosed space
- B. Until the first test after entry shows a safe atmosphere
- C. For the first 15 minutes after entry
- D. Until the attendant leaves for other duties
Show answer
Answer: A. Until all employees leave the enclosed space
The ventilation "shall begin before entry is made" and "shall continue until all employees leave the enclosed space."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
10. Employees work on cable in a manhole. Under 1910.269(t)(8), what must the employer do about the cable's metallic sheath?
- A. Remove the sheath before work begins
- B. Paint the sheath to mark the cable being worked
- C. Nothing, because the rule covers buried cable only
- D. Maintain metallic-sheath continuity, or treat the cable sheath as energized
Show answer
Answer: D. Maintain metallic-sheath continuity, or treat the cable sheath as energized
The rule states that "the employer shall maintain metallic-sheath continuity, or the cable sheath shall be treated as energized."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Fall protection, ladders and tools
11. Under 1910.269(h)(3), when shall conductive ladders be used in specialized high-voltage work?
- A. Whenever a nonconductive ladder is not on the truck
- B. When the employer demonstrates that nonconductive ladders would present a greater hazard to employees than conductive ladders
- C. Whenever the work is done at night
- D. Whenever the ladder is shorter than the structure being climbed
Show answer
Answer: B. When the employer demonstrates that nonconductive ladders would present a greater hazard to employees than conductive ladders
Portable conductive ladders "may not be used near exposed energized lines or equipment. However, in specialized high-voltage work, conductive ladders shall be used when the employer demonstrates that nonconductive ladders would present a greater hazard to employees than conductive ladders."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
12. A portable generator supplies cord- and plug-connected equipment covered by 1910.269(i)(2). Under 1910.269(i)(3)(i), how may the generator supply that equipment?
- A. Through a receptacle on a nearby building's wiring
- B. Through a receptacle box set on the ground away from the generator
- C. Only through receptacles mounted on the generator or the vehicle
- D. Through any receptacle, if the cord is shorter than 50 feet
Show answer
Answer: C. Only through receptacles mounted on the generator or the vehicle
"The generator may only supply equipment located on the generator or the vehicle and cord- and plug-connected equipment through receptacles mounted on the generator or the vehicle."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Mechanical equipment and overhead lines
13. An outrigger on mobile equipment is outside the clear view of the operator. Under 1910.269(p)(2)(ii), when may it be extended or retracted?
- A. Whenever the horn is sounded first
- B. Whenever the outrigger pads are already in place
- C. Whenever the boom is stowed
- D. Only when all employees are outside the range of possible equipment motion
Show answer
Answer: D. Only when all employees are outside the range of possible equipment motion
"Outriggers may not be extended or retracted outside of the clear view of the operator unless all employees are outside the range of possible equipment motion."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
14. Employees will install new lines parallel to existing energized lines. Under 1910.269(q)(2)(iv), what must happen before they do?
- A. The employer shall make a determination of the approximate voltage to be induced in the new lines, or work shall proceed on the assumption that the induced voltage is hazardous
- B. The existing lines shall always be removed first
- C. The new lines shall be installed only at night
- D. The employer shall notify OSHA of the work
Show answer
Answer: A. The employer shall make a determination of the approximate voltage to be induced in the new lines, or work shall proceed on the assumption that the induced voltage is hazardous
The rule states that "the employer shall make a determination of the approximate voltage to be induced in the new lines, or work shall proceed on the assumption that the induced voltage is hazardous."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
15. During installation of overhead lines, between whom does 1910.269(q)(2)(ix) require reliable communications?
- A. The pulling-rig operator and the utility's system operator only
- B. The reel tender and the host employer's safety office
- C. The reel tender and the pulling-rig operator
- D. The crew and the local fire department
Show answer
Answer: C. The reel tender and the pulling-rig operator
The employer "shall ensure that employees maintain reliable communications, through two-way radios or other equivalent means, between the reel tender and the pulling-rig operator."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Line-clearance tree trimming
16. Before a line-clearance tree trimmer who is not a qualified employee climbs a tree, 1910.269(r)(1)(i) requires a determination of the nominal voltage of electric power lines posing a hazard. What alternative does the rule allow?
- A. Skipping the determination if the trimmer uses only hand tools
- B. Determining the maximum nominal voltage to which the employee will be exposed, if all lines are considered as energized at this maximum voltage
- C. Treating all lines as deenergized until a test shows otherwise
- D. Making the determination after the trimmer has finished climbing
Show answer
Answer: B. Determining the maximum nominal voltage to which the employee will be exposed, if all lines are considered as energized at this maximum voltage
"However, a determination of the maximum nominal voltage to which an employee will be exposed may be made instead, if all lines are considered as energized at this maximum voltage."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
17. A climbing rope has become wet during line-clearance tree trimming. What does 1910.269(r)(7)(vii) say about using it near exposed energized lines?
- A. It may be used if the trimmer wears rubber insulating gloves
- B. It may be used near lines energized at 750 volts or less
- C. It may be used once it has been inspected
- D. It may not be used near exposed energized lines
Show answer
Answer: D. It may not be used near exposed energized lines
"A rope that is wet, that is contaminated to the extent that its insulating capacity is impaired, or that is otherwise not considered to be insulated for the voltage involved may not be used near exposed energized lines."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
Substations, generating plants and special conditions
18. An employee who does not regularly work in an attended substation enters it. What does 1910.269(u)(6)(i) require of that employee?
- A. To sign a visitor log kept at the gate
- B. To lock the entrance behind him or her
- C. To report his or her presence to the employee in charge of substation activities to receive information on special system conditions affecting employee safety
- D. To stay outside the fence until the substation is deenergized
Show answer
Answer: C. To report his or her presence to the employee in charge of substation activities to receive information on special system conditions affecting employee safety
Each employee other than those regularly working in the station "shall report his or her presence to the employee in charge of substation activities to receive information on special system conditions affecting employee safety."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
19. Exciter or generator brushes are to be changed while the generator is in service, and the check shows a ground condition exists. What does 1910.269(v)(2) say?
- A. The brushes may not be changed while the generator is energized
- B. The brushes may be changed if the employee wears gloves
- C. The brushes may be changed if the work takes less than 10 minutes
- D. The brushes may be changed if a second employee watches
Show answer
Answer: A. The brushes may not be changed while the generator is energized
The field must be checked for a ground condition first, and "The brushes may not be changed while the generator is energized if a ground condition exists."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)
20. Employees will work on an instrument in a current transformer secondary circuit, and the employer cannot deenergize the primary of the current transformer. What does 1910.269(w)(2) require?
- A. The secondary shall be opened before work begins
- B. The employer shall bridge the circuit so that the current transformer secondary does not experience an open-circuit condition
- C. The work may go ahead with no further step
- D. The instrument shall be removed while the secondary is open
Show answer
Answer: B. The employer shall bridge the circuit so that the current transformer secondary does not experience an open-circuit condition
Employees may not open the secondary while the transformer is energized, and if the primary cannot be deenergized, "the employer shall bridge the circuit so that the current transformer secondary does not experience an open-circuit condition."
Source: eCFR: 29 CFR 1910.269, Electric power generation, transmission, and distribution (as of Nov 4, 2026)